Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe

Nordex to upgrade 30-MW wind farm in Spain

By Michelle Froese | December 5, 2017

The Nordex Group has won a 30-MW order to renovate one of Acciona Energía’s oldest wind farm in Spain. In the second half of 2018, it will upgrade the 30-MW El Cabrito wind farm with 12 multi-megawatt turbines.

Spanish wind farm

Nordex will upgrade one of Acciona Energía’s oldest wind farm’s in Spain with 12 multi-megawatt turbines.

In this connection, Acciona Energia has opted for eight N100/3000 turbines and four AW70/1500 turbines that fit optimally in the existing wind layout. The contract provides for the delivery of the turbines and a guarantee for an initial two-year period.

The wind farm was originally constructed around 25 years ago, and was one of the first projects of its kind at that time. Accordingly, the 90 turbines, each of which have a nominal capacity of around 330 KW, are now showing their age.

“This project is something of an ideal constellation for us, as with it, we can demonstrate that wind power has gained substantially in efficiency and show that this kind of projects makes good ecological and economic sense,” said Patxi Landa, Chief Sales Officer of Nordex SE.

With a capacity that is up to 10 times greater, the 12 new turbines will produce an increased energy yield despite having the same nominal capacity, whilst simultaneously lowering the operating costs.

At the same time, the landscape will also be improved aesthetically, thanks to the substantially lower number of turbines. El Cabrito is situated on a mountain range near Tarifa in southern Spain where high wind speeds prevail. Acciona Energía will handle the dismantling of the older wind systems.


Filed Under: News, Projects, Repowering
Tagged With: Nordex
 

About The Author

Michelle Froese

Related Articles Read More >

Equinor launches ECO Liberty service operations vessel for Empire Wind offshore project
Triton Anchor receives U.S. patents for offshore anchor
US government allows Empire Wind offshore project to resume construction
Richardson Electronics to deliver pitch energy modules to TransAlta wind fleets

Podcasts

Wind Spotlight: Looking back at a year of Thrive with ZF Wind Power
See More >

Windpower Engineering & Development Digital Edition Archive

Digital Edition

Explore the full archive of digital issues of Windpower Engineering & Development, presented in a high-quality, user-friendly format. Access current and past editions, clip, share, and download valuable content from the industry’s leading wind power engineering resource.

Windpower Engineering & Development
  • Wind Articles
  • Solar Power World
  • Subscribe to Windpower Engineering
  • About Us/Contact Us

Copyright © 2025 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising

Search Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe