Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe

GE partners with ENGIE to supply 360 MW wind farm in Brazil

By Michelle Froese | February 5, 2018

GE Renewable Energy announced it has signed an agreement with ENGIE to supply 144 of its 2.5-116 turbines for the Umburanas Wind Farm Complex in upstate Bahia, Brazil. This 360-MW wind installment will add to the 326.7 MW under commissioning by GE at the neighboring Campo Largo I wind farm (also owned by ENGIE).

GE and ENGIE -- Brazil wind farm“Together, these two wind farms represent our largest volume of turbines in a single cluster in Brazil,” said Vikas Anand, General Manager, GE’s Onshore Wind Business, Americas. “It’s a great honor to be working with ENGIE and to continue to grow the wind capacity together and increase the wind energy footprint in Brazil. This newly announced project also demonstrates our continued commitment to Brazil’s Wind industry.”

GE Renewable Energy will also be providing 10 years of O&M at the Umburanas Wind Farm.

ENGIE’s potential in the region of Umburanas and Sento Sé exceeds 1,300 MW. The 326.7-MW Campo Largo 1 site is currently under construction and will begin commercial operations in January 2019. It will create enough energy to power a population of up to 600,000 inhabitants. The newly announced 360-MW Umburanas project has also begun construction, and the first turbines are set to be delivered in 2018.

“We have selected GE Renewable Energy to supply turbines for both projects and we trust GE’s commitment to implement the projects according to the agreed business plan, therefore reinforcing the partnership between the two companies,” said Eduardo Sattamini, president for ENGIE Brasil Energia.

GE’s 2.5-116 turbine for Umburanas will feature 90-meter-tall towers. This machine provides efficiency gains to the wind farm by maximizing energy production, reducing infrastructure spending and making for an even more competitive wind levelized cost of electricity (LCOE). The turbine’s energy production is increased by as much as 32% at 8.5 m/s, compared to GE’s 1.7 MW.


Filed Under: News, Projects, Turbines
Tagged With: GE
 

About The Author

Michelle Froese

Related Articles Read More >

Equinor launches ECO Liberty service operations vessel for Empire Wind offshore project
Triton Anchor receives U.S. patents for offshore anchor
US government allows Empire Wind offshore project to resume construction
Richardson Electronics to deliver pitch energy modules to TransAlta wind fleets

Podcasts

Wind Spotlight: Looking back at a year of Thrive with ZF Wind Power
See More >

Windpower Engineering & Development Digital Edition Archive

Digital Edition

Explore the full archive of digital issues of Windpower Engineering & Development, presented in a high-quality, user-friendly format. Access current and past editions, clip, share, and download valuable content from the industry’s leading wind power engineering resource.

Windpower Engineering & Development
  • Wind Articles
  • Solar Power World
  • Subscribe to Windpower Engineering
  • About Us/Contact Us

Copyright © 2025 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising

Search Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe