Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe

Gamesa wins two new wind orders from Iberdrola for the supply of 325 MW in Mexico

By Michelle Froese | January 20, 2017

Gamesa, a global technology provider in wind energy, has won two new agreements with Iberdrola for the supply of 325.5 MW in Mexico. These orders consolidate Gamesa’s position in this market, in which it has entrenched itself as the leading OEM.

The first contract encompasses the installation and commissioning of 84 of the company’s G114-2.625 MW turbines (220.5 MW) at the Pier IV wind farm located in the state of Puebla. The turbines are scheduled for delivery in early 2018. The facility is set to be commissioned in March 2019.

In total, Gamesa has been commissioned to install 134 of its G114-2.1 MW and G114-2.625 MW wind turbines in Mexico.

The second order entails the supply of 50 of Gamesa’s G114-2.1 MW turbines (105 MW) at the Santiago Eólico wind farm located in the state of Guanajuato. These turbines are due to be installed during the second half of 2018 and the complex is scheduled to come on stream in April 2019. Besides these new orders, Gamesa has already supplied 360 MW to various wind farms developed by Iberdrola in Mexico.

Gamesa’s 2.1-MW turbines offer some of the most competitive metrics in terms of investment per-megawatt installed and cost-per-unit of output. This is possible thanks to their versatile combination of a 2.1-MW generator with one of five possible rotor sizes (diameters of 80, 87, 90, 97 and 114 m)- for optimal performance no matter the site or wind conditions.

The firm’s 2.625-MW turbines, meanwhile, which are underpinned by the technology proven and validated in Gamesa’s 2.0-MW platform, come in three rotor sizes: 106, 114, and 126 m.  Their higher nominal capacity, at 2.625 MW, delivers a higher output and a lower cost of energy.

Since it began to do business in Mexico back in 1999, Gamesa has has installed 1,100 wind turbines nationwide (close to 1,900 MW), cementing its position as the leading OEM in this market according to the most recent rankings compiled by MAKE Consultancy. The company has also been an active player in the wind-farm development and operation and maintenance segments.


Filed Under: News, Projects
Tagged With: Gamesa
 

About The Author

Michelle Froese

Related Articles Read More >

Equinor launches ECO Liberty service operations vessel for Empire Wind offshore project
Triton Anchor receives U.S. patents for offshore anchor
US government allows Empire Wind offshore project to resume construction
Richardson Electronics to deliver pitch energy modules to TransAlta wind fleets

Podcasts

Wind Spotlight: Looking back at a year of Thrive with ZF Wind Power
See More >

Windpower Engineering & Development Digital Edition Archive

Digital Edition

Explore the full archive of digital issues of Windpower Engineering & Development, presented in a high-quality, user-friendly format. Access current and past editions, clip, share, and download valuable content from the industry’s leading wind power engineering resource.

Windpower Engineering & Development
  • Wind Articles
  • Solar Power World
  • Subscribe to Windpower Engineering
  • About Us/Contact Us

Copyright © 2025 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising

Search Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe