Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe

New igus bearing assists in quick, easy liner replacement

By Amy Stankiewicz | June 6, 2018

drylin W Exchange

igus has introduced drylin W Exchange, a new bearing for its drylin W linear system in which the liner can be replaced directly on the rail without dismantling the system.

igus has introduced drylin W Exchange, a new bearing for its drylin W linear system in which the liner can be replaced directly on the rail without dismantling the system. Using a practical assembly tool, users can push the old liner out of the housing, clip the new one on to the shaft and push it into the housing for a flush fit.

“When changing the liner on the linear glides guide rail, for example where extremely abrasive sand or glass dust is present, the entire linear slide has to be pushed off the rail,’’ said Robert Dumayne, director at igus. “For linear axes or multi-axis gantries with a toothed belt drive, this requires a high-assembly effort and long machine downtime.”

The new bearing housing for the drylin W linear system enables easy liner change directly on the linear rail. Users remove the side cover of the bearing housing on the linear slide can with a screwdriver then push the liner out of the carriage. The replacement liner, which is made of wear-resistant and abrasion-resistant iglidur J200 tribopolymer material, is clipped on to the rail and inserted precisely into the slide with the assembly tool. Igus supplies the assembly tool free of charge, and it can be 3D printed.

The new bearing housing can be retrofitted to all existing drylin W systems of size 10 with a shaft, including guides, linear axes, and linear robots. Additional sizes are in the works.


Filed Under: Bearings, Components, News
Tagged With: igus
 

About The Author

Amy Stankiewicz

Related Articles Read More >

Turbine bearing supplier Malloy completes warehouse expansion
South Fork Wind’s first installed turbine delivers power to Long Island
Cabling completed on Vineyard Wind 1 offshore project
GE expands New York wind turbine factory, creating 200 new jobs

Podcasts

Wind Spotlight: Looking back at a year of Thrive with ZF Wind Power
See More >

Windpower Engineering & Development Digital Edition Archive

Digital Edition

Explore the full archive of digital issues of Windpower Engineering & Development, presented in a high-quality, user-friendly format. Access current and past editions, clip, share, and download valuable content from the industry’s leading wind power engineering resource.

Windpower Engineering & Development
  • Wind Articles
  • Solar Power World
  • Subscribe to Windpower Engineering
  • About Us/Contact Us

Copyright © 2025 WTWH Media LLC. All Rights Reserved. The material on this site may not be reproduced, distributed, transmitted, cached or otherwise used, except with the prior written permission of WTWH Media
Privacy Policy | Advertising

Search Windpower Engineering & Development

  • Home
  • Articles
    • Most recent posts
    • News
    • Featured
  • Resources
    • Digital issues
    • Podcasts
    • Suppliers
    • Webinars
    • Events
  • Videos
  • 2025 Leadership
    • 2024 Winners
    • 2023 Winners
    • 2022 Winners
  • Magazine
  • Advertise
  • Subscribe